 | | The NEW Wembley stadium is probably one of the largest and well built Stadiums in the World. ABFAD Limited was a major contributing company in meeting mile stone targets to complete the stadium, over a 18 month period on all high level areas. Originally ABFAD Limited management and access personnel were tested against other rope access companies on site. Each access company were given a paint specification and target areas to complete. On every occasion ABFAD Limited personnel were the only access company to meet target dates to required specification and therefore given the contract to provide access personnel to paint all high level steelwork in the stadium. ABFAD Limited went on to provide access welding, mechanical and vent cleaning personnel to complete some of the vital commission work at the stadium. ABFAD Limited access coatings personnel also worked on the Cardiff Millennium Stadium up to the 500foot level on the four peaks. Due to our project management experience ABFAD Limited provide unique methods to control safety, quality and productivity which together make us a force which our competitors cannot reckon with which has been proven not only at Wembley Stadium but on many projects around the UK and abroad. If you are looking for a company who controls all key valves such as safety, high quality of workmanship and the best productivity that can be achieved look no further contact us now, | | ABFAD also conduct other professional works such as civils, vessel/tank inspections with visual and remote video camera, safe pressure testing, principle contractor to within CDM regulations and general maintenance. |
|