| Rope Access Civil and Concrete |
![]() ABFAD conduct major civil engineering projects in addition to general concrete inspection, repairs and maintenance. All work is assessed for best possible access which may include motorized platforms, decking, scaffolding and Rope Access to ensure our client achieves the best possible cost for whatever size project is authorized. ABFAD rope and platform access– Concrete survey on multi-storey car park to determine condition of re-bars and surface cover. Repairs undertaken as necessary, all by means of rope access techniques. View here on MISSION IMPOSSIBLE a review a civil project costing by other companies at between two to three MILLION pounds and achieved by ABFAD for under one million pounds. Repair to concrete ceiling in Paper Mill. Original concrete removed, new areas rendered and sealed against chemical attack from paper process plant utilising platform and Rope Access techniques Concrete survey on block of flats to determine condition of re-bars and surface cover. Repairs undertaken as necessary all by means of Rope Access techniques Removal of 200 tonne of reinforced concrete above a 24Hour working paper process plant with non disturbance or shutdown required due to unique decking ABFAD designed, fabricated and installed, using Rope Access techniques. For additional information on Abfad's services and how we could benefit you... Please do not hesitate to Contact us |




| Home |
| Company Profile |
| Quality Assurance |
| Brochures and Services |
| Services Gallery |
| Employment |
| Contact us |
| Major UK Power Station |
| High Level Rope Access |
| British Energy |
| HMS Warrior 1860 |
| Specialist Access |
| Specialist Coatings |
Civil and Concrete